Projects
Commercial
Hotel
Industrial
Hospital
Residential
Engineered Smoke Control System
Latest Out Coming Projects for Year 2020 ~ 2025
Commercial
Commercial

Project Name | System |
---|---|
Cable Tunnel | ACMV System |
Changi Air-Port Terminal 3 | ACMV System |
Changi Airport Terminal 1 | Duct Work |
Changi Airport Terminal 1 | MVF – Duct Work |
City Hall Link Way | ACMV System |
JTC – Orchard | ACMV System |
Kim Chuan Depot SMRT | ACMV System |
LaSalle College of the Arts | ACMV System |
Mandai | Duct Work |
Mandai Lake | MV Fan & Ductwork with Odor Control |
Marina One | ACMV System |
MBS – Apple Store | ACMV System |
MBS (Casino at Level 2) | ACMV System |
MRT Station (DT27 / DT28) | Duct Work |
MRT Station DT31 | Duct Work |
One Supreme Court | ACMV System |
Paya Lebar – PLQ | Duct Work |
Sentosa Gateway | ACMV System |
SIA Computer Centre | ACMV & BMS System |
Singtel | A & A Work |
Supreme Court | ACMV System |
The Central @ B1 for LTA | ACMV System |
Tuas Laundry Plant | Install Spiral Duct |
UIC Building | ACMV System |
UTAC | Duct Work, Pipe Works |
Institute of Technical Education | A&A Work |
Hotel
Hotel

Project Name | System |
---|---|
Albert Court Hotel | Chilled Water System |
Changi Merinde Hotel | ACMV System |
Hoe Changi Hotel | Chilled Water System |
NUS @ Student Hostel | ACMV System |
Sentosa Hotel | ACMV System |
Service Apartment @ Shrewsbury | ACMV System |
Peninsula Excelsior Hotel | Chilled Water System |
Bukit Manis Sentosa | ACMV System |
Industrial
Industrial

Project Name | System |
---|---|
ASM (Woodlands) | Ductwork System |
Hyundai Motor Innovation Centre | ACMV System |
ICPH | ACMV System |
Jurong Island | ACMV System |
Jurong Island (EFW) | Ductwork System |
Lower Seletar Water Work | ACMV System |
Marsiling Industrial @ 33 / 35 Estate | ACMV System
|
NUS – 13 | Clean Room System |
NUS – 7 | Clean Room System |
SATS Singapore | Ductwork System |
Schott Electro Packaging | AC System |
VDL (259 Jalan Ahmad Ibrahim) | ACMV System |
Gali Batu Bus Deport | Ductwork System |
Tuas Water Reclamation Plant (TWRP) | Ductwork System |
VDL SQ1 Building | ACMV and BMS System |
Gali Batu Bus Depot | Ductwork System |
Hospital
Hospital

Project Name | System |
---|---|
Econ Medicare Central | ACMV System |
Health Care ( Expo) | ACMV System |
Mount Alvernia Hospital (MAH) | ACMV System |
Renci Hospital | AC System |
Singapore General Hospital | Chilled Water System |
Thye Hua Kwan Hospital | ACMV System |
Residential
Residential

Project Name | System |
---|---|
43 Oxley Road | ACMV System |
8 @ Mount Sophia Condominium | AC System |
Gallop Green Condominium | AC System
|
Jardine Condo @ 16, Dunearn Rd | AC System
|
Lincoln Modern Condominium | AC System
|
Parc Emily Condominium | AC System
|
Parc Vista Condominium | AC System
|
St. Regis Residences | AC System |
UIC | ACMV System |
UMCI Dormitory | AC System |
Urban Resorts @ 32, Cairnhill Rd | Ductwork System |
Urban Suites | Ductwork System |
Tengah Plantation Contact 6 | MV System
|
Engineered Smoke Control System
Engineered Smoke Control System

Project Name | System |
---|---|
Kim Chuan Depot (SMART) | Smoke Purging System and Engineered Smoke Control System |
24 Leng Kee Road | Engineered Smoke Control System
|
42 / 48 Pandan Road | Engineered Smoke Control System
|
NTUC Food Distribution | Engineered Smoke Control System |
Mount Alvernia Hospital | Engineered Smoke Control System |
VDL SQ1 Building | Engineered Smoke Control System |
Central Water Catchment (Mandai Lake) | Engineered Smoke Control System |
Singapore General Hospital |
Engineered Smoke Control System |
Changi Airport Terminal 2 | Engineered Smoke Control System |
Latest Out Coming Projects for Year 2020 ~ 2025
Outcoming Projects

Project Name | System |
---|---|
Tuas Water Reclamation Plant (TWRP) | ACMV System |
Chinese Swimming Club | ACMV System |
Garden By the Bays | ACMV System |
Changi Airport Terminal 2 | ESCS System |
Changi Airport Terminal 5 | ACMV System |